Project Overview
70 Eaton Road is a strategically located industrial subdivision situated within the emerging Western Sydney Aerotropolis, adjacent to the Western Sydney International (Nancy Bird Walton) Airport. The 6.6-hectare site has approval for subdivision into 13 industrial and agribusiness lots across two stages, together with new roads, stormwater infrastructure, bulk earthworks and associated civil works.
Diversi Consulting was engaged by Ozkor Pty Ltd to provide integrated project management, civil engineering design, cost planning, authority coordination and infrastructure strategy, supporting the project from Development Approval through to Subdivision Works Certificate (SWC) design and implementation planning.
Design & Engineering Challenges
Progressing the subdivision required extensive coordination across multiple consultants, utility providers and approval authorities while preparing the project for future construction.
A significant challenge was the availability of regional water and wastewater infrastructure servicing the broader Aerotropolis precinct. Through engagement with Sydney Water, Water Servicing Coordinators and specialist consultants, Diversi identified servicing constraints that had the potential to impact project programme, feasibility and delivery timing.
The project also required coordination between surveyors, geotechnical engineers, electrical designers, planning consultants and future subdivision certifiers. Accurate survey information, utility servicing strategies and authority requirements all needed to be carefully managed to support detailed engineering design and future project delivery.
Engineering Solutions
Diversi Consulting delivered integrated project management and civil engineering services, providing detailed subdivision design together with strategic infrastructure planning and commercial advice.
The engineering scope included internal road design, stormwater drainage, on-site detention, bulk earthworks, erosion and sediment control, retaining wall coordination and utility servicing planning. Diversi also coordinated specialist consultants, managed authority liaison, prepared infrastructure cost planning and Opinions of Probable Cost, and provided development staging advice to support project feasibility and future delivery.
Rather than simply identifying servicing constraints, Diversi continued to work with infrastructure providers and specialist consultants to investigate practical servicing pathways and alternative infrastructure strategies capable of supporting future development of the site.
Project Outcomes and Community Impact
The 70 Eaton Road subdivision will deliver 13 industrial and agribusiness lots within one of Western Sydney’s fastest growing employment precincts, supporting the ongoing development of the Western Sydney Aerotropolis.
Through integrated project management, engineering design and infrastructure strategy, Diversi identified key servicing risks early, providing the client with greater certainty around project feasibility, programme and future development pathways. The project demonstrates Diversi’s ability to deliver coordinated engineering and project management services for complex industrial developments within rapidly evolving infrastructure environments.